Insights · Arbitration

Challenging a construction award under Section 34

The High Court is not a court of appeal from the tribunal. The petition has to be built as if that sentence is true.

A general note for contractors, employers, and in-house counsel. It is not legal advice and not an advertisement of past results.

Most Section 34 petitions in construction matters fail for a simple reason: they ask the court to prefer a different delay analysis, a different reading of a variation, or a different quantum. That is an appeal. Section 34 of the Arbitration and Conciliation Act, 1996 is not an appeal. After the 2015 amendments and the Supreme Court’s restatement of patent illegality and public policy, the Delhi High Court will not retry the merits because the losing party is unhappy with the numbers.

What the court will look at

The working questions are narrow. Did the tribunal ignore a binding contractual bar? Did it award a head of claim the contract shut out? Did it fail to decide a pleaded issue that went to the root? Did it take a view that no reasonable tribunal could take on the face of the award? Was there a breach of natural justice in the hearing that actually prejudiced the party?

If the answer to those questions is no, the petition is usually a cost order waiting to happen. If the answer is yes, the petition still has to show it from the award and the contract, not from a fresh expert report filed in the High Court.

The construction-specific traps

Construction awards are long. They deal with prolongation, disruption, price adjustment, mobilisation advances, and availability of site. Tribunals often bundle these heads. A Section 34 challenge that attacks “the delay award” as a single lump, without isolating the clause the tribunal is said to have rewritten, gives the court nothing to hold on to.

FIDIC and public-works forms contain notice provisions, limitation of liability, and exclusive-remedy clauses. If the tribunal treated a condition precedent as a directory notice, that may be a ground. If it construed an ambiguous special condition against the employer, that is usually a possible view, and possible views are not set aside.

Limitation and the record

The three-month clock in Section 34(3), with a further thirty days on sufficient cause, is unforgiving. The petition should annex the contract, the award, the key correspondence the tribunal relied on, and a short chronology. A 200-page affidavit that re-argues quantum does not help. A ten-page petition that puts the offending paragraph of the award next to the clause it contradicts often does.

Stay of the award

A Section 34 petition does not stay enforcement. Stay under Section 36 is a separate application, usually on terms. In construction cases the court will look at the cash flow of the award, the solvency of the claimant, and whether the challenge is arguable. Deposit of a substantial part of the awarded sum is the ordinary price of a stay, not a punishment.

Related: Construction & Infrastructure Arbitration.

Discuss a Section 34 or enforcement file